Hidden mold prompts renovations at McClusky City Hall
Renovation work at McClusky City Hall is underway after an investigation into employee health concerns revealed significant mold hidden inside the building's walls.
Construction began Aug. 3 and is expected to continue through the remainder of the month as crews work to remove damaged materials and address moisture-related issues within the building.
McClusky Auditor Amanda Saueressig said she was saddened to see her office, which she had spent considerable time cleaning and updating, stripped down to the studs. However, the work uncovered problems that may have been affecting both employee health and the building itself.
Saueressig said employees along with council members had reported feeling ill after spending time in the office. She arranged for an air-quality test, but the results showed mold levels within a normal range.
Still concerned, Saueressig pushed for further investigation.
When city maintenance workers, including Nathan Rhoads, removed sheetrock from the auditor's office, they discovered mold growth throughout the lower portions of the wall cavities.
According to Saueressig, consultants with Arrow Service Team determined the building's exterior walls had been constructed without a moisture barrier, an important component in brick construction that helps prevent moisture intrusion.